06thDecember 2005. Apologies for the delay with our third update, but things have been manic.We left off last time with the steel work ![]() With our new reception floor being put in within an hour! ![]() The reception and changing area began to take shape ![]() ![]() The next major occurrence was the removal of the original floor. ![]() Obviously, this made a big difference to the feel of the space. All of a sudden, our building was beginning to feel ![]() Throughout the day, more of the floor was removed, and the effective height of the building really became apparent. ![]() The reception and toilet areas are progressing well ![]() ![]() And the space created for the café is really good. ![]() As promised, the 14th of November saw the arrival of the wall. ![]() There were some heart stopping moments as the pallets of ready cut ply were ‘wobbled’ from lorry to basement. ![]() But the day went without a hitch – Almost (the JCB ran over a sharp edge of steel and got a puncture, incidentally, ![]() The Livingstone team soon got underway, and the bouldering wall sprung up in about a week. ![]() ![]() ![]() ![]() Work then began on the slab. ![]() ![]() The next major installment is the staircase and walkway, which is due for completion by Christmas. At this stage, it will be very difficult to be open by the second weekend of January and it is more likely that If we have time, you might see another update before Christmas. If not, there will at least be some more Thanks again for all the support, Donna and Adam. |